Recommended → Debated → Decided
Recommended
Staff framed stormwater as the lead priority domain.
Debated
The stormwater board sheet (Attachment B) shows dot clusters on: contracting for a drainage basin geological survey by December 1, 2026; improving stormwater management to move burden away from property owners toward city property/infrastructure; and incentivizing permeable technology. Staff's proposed stormwater objectives include finalizing the Stormwater Master Plan Update with neighborhood-level hydraulic modeling, executing CIP projects, and floodproofing the wastewater system — specifically ensuring all 33 lift stations withstand major flooding. The drainage basin survey deadline (Dec. 1, 2026) circled in red signals it's expected to close within the current FY — worth tracking.
Decided
Workshop consensus; formal resolution pending.
Quotes from the meeting
Transcript-derived quotes pending — this brief was generated
before the meeting was transcribed (or the transcript had no
quotable moments for this item). Run
civic transcribe --meeting-id=ab:2026-04-06:priority-setting-meeting
then re-brief.