Beach Gazette · Civic Bot Sign in
← Latest
Atlantic Beach ·Commission Meeting ·Apr 13, 2026 ·Item 9.A · Ordinance No. 90-26-259

Ragtime Redevelopment Development Agreement (Public Hearing & Final Reading)

high confidence
Recommended → Debated → Decided
Recommended
Staff recommended adoption on second reading. Recommendation: Adopt Ordinance No. 90-26-259 on second read.
Debated
The south end of the existing building (former Ragtime Restaurant) is being redeveloped to include significant interior remodeling and adding rooftop dining space; as a result the project triggered Section 24-176(3), requiring a landscape buffer between the building and the street. The existing property was developed with zero setbacks along Atlantic Boulevard and Ocean Boulevard making it impracticable to install the required landscaping between the building and the street; installing or enhancing landscaping at the property located at 0 Ahern (parking lot) would significantly reduce the number of available parking spaces. The developer estimated the cost to install the required landscaping at $162,595.00, and staff concurred. The proposed Development Agreement provides that, in lieu of installing the required landscaping on site, the developer would contribute this amount to the City. The agreement states that the funds shall be "deposited into the City's Beaches Town Center Fund, Tree Fund, or another designated City account and used exclusively for off-site landscaping or environmental enhancements within the Beaches Town Center area of the City."
Decided
At March 23 first reading, a unanimous vote was taken to Adopt Ordinance No. 90-26-259 on first reading.[^s8] April 13 final reading outcome: **minutes not provided — minutes do not record the outcome.**
Quotes from the meeting
Transcript-derived quotes pending — this brief was generated before the meeting was transcribed (or the transcript had no quotable moments for this item). Run civic transcribe --meeting-id=ab:2026-04-13:commission-meeting then re-brief.